The title says it all. This page should include at least the first floor framing.
 
Framing Photos
Mikus standing at the 10 foot living room window-to-be
View of construction from the south
7/13: West side
7/13: East side
Looking south-west
07/27
07/27: nice fir round from the woods
07/29: 4x10 floor joists going in
07/29: interior
08/10: looking from the entrance towards the living room
08/10: looking from the living room towards kitchen and dining room
08/10: looking from the kitchen towards the dining room
08/10: kids in the shower
08/10: looking from the living room into the library/guest room
08/10: looking out the south kitchen window
08/17: T&G and sleepers installed, looking east
08/17: looking downstairs, ahead are ceiling beams which will remain open
08/21: plywood decking over sleepers and insulation, pilot rock watching over
08/24: iza’s room
08/24: mik’s room
08/24: parents’ room
08/24: looking south-west, open area above living room below
08/24: looking south-east
08/24: looking south-west
09/08: Seth doing chinups while rounding the rafters
09/08: A little perspective, Seth 20 feet off the ground
09/08: Where did Seth go???
09/14: boom truck lifting 24’ 4x12s
09/15: from the west
09/15: from the east
09/15: from the south-east
09/15: west side, back
09/15: clerestory pony wall sitting on a 6x18 beam